What do scheduling errors cost your company per year?

A crew left standing at the gate in the morning, a driver without the right licence category, a crane booked twice. Enter your figures and see at once what that costs, and what you save over 1, 3 and 5 years. With Belgian sector figures and sources. No email address needed.

The short answer: one lost crew-day costs a crew of three with a machine €1,100 to €1,800 [1][4]. A company with 20 workers loses €25,000 to €75,000 a year to that, depending on how often it goes wrong [13]. Below you work it out with your own figures.

Over the shoulder of a contracting company manager in the site office: the ROI calculator bar chart on his screen, helmet and work jacket on the desk
the sum every planner knows: cost of errors against the cost of the tool, over 1, 3 and 5 years

Your figures

€47
30
4
70%

Direct yearly cost of scheduling errors

€52,740
range €42,192 to €63,288
Lost crew-days
Idle equipment
Site-access and compliance incidents
Not counted: lost margin, claims, lost customers, your own hours+ …

Your ROI with Planningtool (cost of errors against total cost of the tool)

ROI = 15×

Planningtool costs €2,388 per year on Growth and prevents 70% of these errors: €36,918 saved, €34,530 net.

€34,530net over 1 year
€103,590net over 3 years
€172,650net over 5 years

Total cost over 1, 3 and 5 years: scheduling errors against Planningtool (TCO)

scheduling errors without Planningtoolremaining errors with PlanningtoolPlanningtool subscription
Book a 20-minute scheduling review

Indication based on sector estimates, not a measurement. Every figure above refers to a source at the bottom of this page; use your own figures, that is what the sliders are for. “Copy for your management” puts a five-line summary on your clipboard, to paste into an email or memo. “Save as pdf” opens your browser's print dialog, where you choose pdf: the pdf holds your figures, the chart, the method and every source with its web address, clickable.

How we calculate

Three items, all direct and measurable.

1. Lost crew-days

Crew size × 8 hours × internal hourly cost. The Belgian construction wage scale (PC 124) has been €18.59 to €22.37 gross per hour since April 2025 [2]; total employer cost is about 1.68 times gross pay [3], which with lost productivity and travel comes to €40 to €55 per hour. Three people at €47 is €1,128 per day. Add the day hire of the equipment that stood with them: a mobile crane from €144 per day, a mini crane €315, aerial platforms €61 to €145 [4][5][6]; with an operator €50 to €150 per hour [8].

2. Site-access and compliance incidents

A crew left at the gate over an expired SCC/VCA card, a client safety training or a nuclear clearance costs at least one crew-day plus recovery and rescheduling. Elia only admits registered and trained contractors [16][17]; nuclear sites require a security certificate applied for 15 days in advance, so an error there cannot be fixed the same day [19]. The cost research puts it at €2,000 to €5,000 per incident; we use €3,000. A roadside check without a valid Code 95 is a €1,740 on-the-spot fine [11]; driving without the right C/CE category is a €1,600 to €16,000 fine plus a possible driving ban (Belgian Road Traffic Act, art. 30) [9][10].

3. What Planningtool prevents, and what the tool itself costs

Planningtool stops double bookings of people and machines, licence conflicts per vehicle and missing certificates at the moment of scheduling. Not every error is a scheduling error: a sick call at six in the morning is caught by no board. That is why the calculator defaults to 70% of errors prevented and lets you set that share yourself. The saving is the prevented cost minus the total cost of ownership (TCO) of the tool. That TCO is the subscription; there are no per-user licences, no servers and no maintenance on your side. Onboarding is tailored and not included here: ask for it in the scheduling review and add it to year 1. Over 3 and 5 years we count without price indexation and without growth of your company.

What we deliberately leave out

Lost margin on the job, contractual delay penalties, lost customers, and the hours you spend rescheduling. The real figure is higher.

Sector scenario at 20 workers [13]AssumptionsPer year
Controlled15 lost crew-days × €1,200, 2 incidents × €2,500€23,000
Realistic30 crew-days × €1,350, 4 incidents × €3,000€49,500
Severe45 crew-days × €1,500, 6 incidents × €4,000€91,500

Sources

Check it yourself.

All figures come from public Belgian sources, gathered in an independent cost study (September 2026). Most are in Dutch or French. Click and read.

  1. Bouw Vlaanderen: wat kost een aannemercontractor hourly rates, €45 to €70 per hour invoiced
  2. ACCG: loon en arbeidsvoorwaarden PC 124, arbeiders 2025-2026 (pdf)construction wage scale from April 2025
  3. Orbiss: loonkost tegenover brutoloontotal employer cost about 1.68 times gross pay
  4. Duma Rent: prijslijst België (pdf)day hire of aerial platforms and cranes
  5. Heli: minikranen hurenmini crane €315 per day
  6. 4-Rent: hoogwerkersaerial platforms €61 to €145 per day
  7. Flebus: kraanwagen hurenmobile crane from €144 per day
  8. Van Rattingen: mobiele kraan met machinist per uur€50 to €150 per hour
  9. Advo-Recht: rijden zonder (geldig) rijbewijsRoad Traffic Act art. 30: €1,600 to €16,000, driving ban
  10. Mijnboete.be: rijden zonder rijbewijsfine amounts 2025-2026
  11. TLV: vakbekwaamheid en Code 95on-the-spot fine from €1,740
  12. FOD Mobiliteit: vakbekwaamheid (Code 95)obligation and 35 hours of training per 5 years
  13. Independent cost study of scheduling errors in Belgian construction (September 2026): scenarios at 20 workerscontrolled €23,000, realistic €49,500, severe €91,500 per year; computed on sources 1 to 12 and 14 to 19. We send the full report on request: sales@planningtool.eu
  14. Prevent-X: documentenchecklist onderaannemers BelgiëSCC/VCA and mandatory documents on site
  15. Belgisch Staatsblad: KB van 14 april 2024health and safety on temporary or mobile construction sites
  16. Elia: General Safety, Health and Environment Rules for contractors (pdf)stop work at once when it cannot be done safely
  17. Elia: voorschriften voor het betreden van een elektrische Elia-ruimte (pdf)access only with a valid certificate and work permit
  18. Elia: opleidingen en testen voor contractantentraining linked to access badges
  19. FANC: veiligheidsattesten en toegangsvergunningen nucleaire sitesapplication at least 15 days before the first working day

From estimate to your own board

Bring your busiest week.
We'll put it on the board.

In a 20-minute scheduling review we put your real jobs on the board and you see at once what turns orange. No sales pitch.

Book a scheduling review